How we install it
Full tear-off to the deck, then spaced sheathing or a breather mesh over solid sheathing so air moves under the shakes. Ice-and-water shield up every valley, cedar breather layer, then No. 1 grade shakes laid to the correct exposure and keyway. Stainless nails, hand-cut valleys, and lead or copper flashing at every wall and chimney.



